• Crypto Movable Mining Containers, Asic & GPU Eth Miners
  • Crypto Movable Mining Containers, Asic & GPU Eth Miners
  • Crypto Movable Mining Containers, Asic & GPU Eth Miners
  • Crypto Movable Mining Containers, Asic & GPU Eth Miners
  • Crypto Movable Mining Containers, Asic & GPU Eth Miners
  • Crypto Movable Mining Containers, Asic & GPU Eth Miners

Crypto Movable Mining Containers, Asic & GPU Eth Miners

Negotiable 1 Piece (MOQ)
Min. Order:
1 Piece
Port:
Shanghai, China
Transport Package:
Polywood Case
Payment Terms:
T/T

Last Login Date:

Jul 03, 2025

Business Type:

Manufacturer/Factory, Trading Company

Main Products:

Low Speed Permanent Magnet AC Motor Generator, Low Water Head Hydro Turbine Generator, Wind Powered Windmill Turbine Generator, High Speed Perpetual Permanent Magnet Motor, Pico Micro Hydroelectric Electricity Generation, Water Power Neodymium Generator Alternator, Rural Small Mini Hydraulic Turbine Generator, High Speed Motor Dynamo Generator, Home Residental Wind Power Electric Generator, Self Magnetic Low Rpm Magnetic Motor Alternator

Product Description

Company Info

Basic Info.

Protection
Anti-static
Installation
Hanging
Housing
Aluminium
Specification
600kw miner container
Origin
China

Product Description

Bitcoin movable  foldable miner container box  Miner Farm ANTBOX  Bitmain bitcoinS19,S9,T17 antminer mining box 
Package

Package size:2170mm*2270mm*1010mm*3pcs
Gross weight:500kg/pcs
20'ctn capacity: 4 sets miner containers


Final size: 6000mm*2380mm*2220mm
A21 Miner container
Product OverviewSpecification
VersionA21
Overall dimensions (length, width and height)(mm)6000*2380*2220
Mining machine capacity162 Ant S17 series, miner-324 Ant S9 series
Operating power (KW) 548-600
Input voltage and frequency318V~415V AC 50~60HZ


 
DetailsDetailed specifications
Overall weight (ton, excluding mining machine)2
Power distribution cabinet main switch capacity(A)1050
Rated current(A)850
Rated power(KW)550
Maximum power(KW)600
Single PDU rated current (A)29
Single machine rated current(A)16
Single socket rated current(A)8
Incoming cable(YJV-0.6/1KV240)*4*3+YJV-0.6/1KV 125*1*3
Snow load (KN/)3.5
Configurationquantity
Switchboard3
Power distribution cabinet to PDU cable27
PDU27
Mining machine power line port324
Switch15
Network cable324
Rack3
Water curtain3
 
Environmental requirements    
 1 A21 needs to be placed on a flat floor with a level of ± 1 degree.
2 If 3 layers are needed, the ground needs to be a hardened ground with a load of 10-18 tons.
3 Altitude: 3000m, transformers and switches greater than 1000m should be derated. For every 100m increase, derating is about 1%.

4 Temperature: -25 ° C ~ 45 ° C; humidity 10% RH ~ 90% RH; the ambient temperature requirement in high humidity area is not higher than 40 ºC, when the ambient temperature is <0 ºC,
It is necessary to close the inlet and outlet wind shutters and start the miner when the internal heating is> 0 ° C.


   
Send your message to this supplier
Miss Maggie Han

Post a Sourcing Request Now

Get Quick Quotes