Bitcoin Btc Crypto Blockchain Eth Bch Asic Movable Foldable Mining Container Servicer
Negotiable | 1 Piece (MOQ) |
Min. Order:
1 Piece
Port:
Shanghai, China
Transport Package:
Polywood Case
Payment Terms:
T/T
Xinda Green Energy Co., Limited
Jiangsu, China
Last Login Date:
Jul 28, 2025
Main Products:
Low Speed Permanent Magnet AC Motor Generator, Low Water Head Hydro Turbine Generator, Wind Powered Windmill Turbine Generator, High Speed Perpetual Permanent Magnet Motor, Pico Micro Hydroelectric Electricity Generation, Water Power Neodymium Generator Alternator, Rural Small Mini Hydraulic Turbine Generator, High Speed Motor Dynamo Generator, Home Residental Wind Power Electric Generator, Self Magnetic Low Rpm Magnetic Motor Alternator
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
Miner1
Protection
Anti-static
Installation
Hanging
Housing
Aluminium
Specification
600kw miner container
Origin
China
Product Description
Bitcoin movable foldable miner container box Miner Farm ANTBOX Bitmain bitcoinS19,S9,T17 antminer mining box
Package
Package size:2170mm*2270mm*1010mm*3pcs
Gross weight:500kg/pcs
20'ctn capacity: 4 sets miner containers
Final size: 6000mm*2380mm*2220mm
Package
Package size:2170mm*2270mm*1010mm*3pcs
Gross weight:500kg/pcs
20'ctn capacity: 4 sets miner containers
Final size: 6000mm*2380mm*2220mm
A21 Miner container | |
Product Overview | Specification |
Version | A21 |
Overall dimensions (length, width and height)(mm) | 6000*2380*2220 |
Mining machine capacity | 162 Ant S17 series, miner-324 Ant S9 series |
Operating power (KW) | 548-600 |
Input voltage and frequency | 318V~415V AC 50~60HZ |
Details | Detailed specifications |
Overall weight (ton, excluding mining machine) | 2 |
Power distribution cabinet main switch capacity(A) | 1050 |
Rated current(A) | 850 |
Rated power(KW) | 550 |
Maximum power(KW) | 600 |
Single PDU rated current (A) | 29 |
Single machine rated current(A) | 16 |
Single socket rated current(A) | 8 |
Incoming cable | (YJV-0.6/1KV240)*4*3+YJV-0.6/1KV 125*1*3 |
Snow load (KN/) | 3.5 |
Configuration | quantity |
Switchboard | 3 |
Power distribution cabinet to PDU cable | 27 |
PDU | 27 |
Mining machine power line port | 324 |
Switch | 15 |
Network cable | 324 |
Rack | 3 |
Water curtain | 3 |
Environmental requirements | |
1 A21 needs to be placed on a flat floor with a level of ± 1 degree. 2 If 3 layers are needed, the ground needs to be a hardened ground with a load of 10-18 tons. 3 Altitude: ≤3000m, transformers and switches greater than 1000m should be derated. For every 100m increase, derating is about 1%. 4 Temperature: -25 ° C ~ 45 ° C; humidity 10% RH ~ 90% RH; the ambient temperature requirement in high humidity area is not higher than 40 ºC, when the ambient temperature is <0 ºC, It is necessary to close the inlet and outlet wind shutters and start the miner when the internal heating is> 0 ° C. |
Send your message to this supplier
People who liked this also liked